VERIFIED SOURCE CATALOG

Explore the infrastructure.
Then verify the opportunity.

Facility facts are drawn from cited published sources and approved by LighterGrid. Available capacity remains separate until it is commercially confirmed.

330approved facilities
FACILITY CATALOG

Source-backed datacenter intelligence

Unknown means undisclosed—not estimated.

CoreSiteoperational

AT1

Atlanta · Americas · AT1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

AT2

Atlanta · Americas · AT2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

BO1

Boston · Americas · BO1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

CH1

Chicago · Americas · CH1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

CH2

Chicago · Americas · CH2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

DE1

Denver · Americas · DE1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

DE2

Denver · Americas · DE2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

LA1

Los Angeles · Americas · LA1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

LA2

Los Angeles · Americas · LA2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

LA3

Los Angeles · Americas · LA3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

MI1

Miami · Americas · MI1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

MI2

Miami · Americas · MI2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

NY1

New York · Americas · NY1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

NY2

New York · Americas · NY2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

VA1

Northern Virginia · Americas · VA1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

VA2

Northern Virginia · Americas · VA2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

VA3

Northern Virginia · Americas · VA3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

OR1

Orlando · Americas · OR1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

SV1

Silicon Valley · Americas · SV1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

SV2

Silicon Valley · Americas · SV2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

SV3

Silicon Valley · Americas · SV3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

SV4

Silicon Valley · Americas · SV4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

SV7

Silicon Valley · Americas · SV7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

SV8

Silicon Valley · Americas · SV8

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

DC1

Washington, D.C. · Americas · DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CoreSiteoperational

DC2

Washington, D.C. · Americas · DC2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

AMS1

Amsterdam · EMEA · AMS1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

AUS2

Austin · Americas · AUS2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

AUS3

Austin · Americas · AUS3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

CHI1

Chicago · Americas · CHI1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

CHI2

Chicago · Americas · CHI2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

CHI3

Chicago · Americas · CHI3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

CHI5

Chicago · Americas · CHI5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

CIN2

Cincinnati · Americas · CIN2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

CIN5

Cincinnati · Americas · CIN5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

CIN6

Cincinnati · Americas · CIN6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

OCB1

Council Bluffs · Americas · OCB1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

DFW1

Dallas · Americas · DFW1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

DFW2

Dallas · Americas · DFW2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

DFW3

Dallas · Americas · DFW3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

DFW4

Dallas · Americas · DFW4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

DFW5

Dallas · Americas · DFW5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

DUB1

Dublin · EMEA · DUB1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

DUR1

Durham · Americas · DUR1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

FRA1

Frankfurt · EMEA · FRA1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

FRA2

Frankfurt · EMEA · FRA2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

FRA3

Frankfurt · EMEA · FRA3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

FRA4

Frankfurt · EMEA · FRA4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

FRA5

Frankfurt · EMEA · FRA5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

FRA6

Frankfurt · EMEA · FRA6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

FRA7

Frankfurt · EMEA · FRA7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

HOU3

Houston · Americas · HOU3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

HOU4

Houston · Americas · HOU4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

LON1

London · EMEA · LON1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

LON2

London · EMEA · LON2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

LON3

London · EMEA · LON3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

LON4

London · EMEA · LON4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

LON5

London · EMEA · LON5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

LON6

London · EMEA · LON6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

MAD1

Madrid · EMEA · MAD1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

MIL1

Milan · EMEA · MIL1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

MIL2

Milan · EMEA · MIL2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NYM1

New York · Americas · NYM1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NYM2

New York · Americas · NYM2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NYM5

New York · Americas · NYM5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NYM7

New York · Americas · NYM7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NVA1

Northern Virginia · Americas · NVA1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NVA2

Northern Virginia · Americas · NVA2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NVA3

Northern Virginia · Americas · NVA3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NVA4

Northern Virginia · Americas · NVA4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NVA5

Northern Virginia · Americas · NVA5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NVA6

Northern Virginia · Americas · NVA6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NVA7

Northern Virginia · Americas · NVA7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NVA8

Northern Virginia · Americas · NVA8

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

NVA9

Northern Virginia · Americas · NVA9

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

OSK1

Osaka · APAC · OSK1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PAR1

Paris · EMEA · PAR1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PHX1

Phoenix · Americas · PHX1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PHX2

Phoenix · Americas · PHX2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PHX3

Phoenix · Americas · PHX3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PHX4

Phoenix · Americas · PHX4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PHX5

Phoenix · Americas · PHX5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PHX6

Phoenix · Americas · PHX6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PHX7

Phoenix · Americas · PHX7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PHX8

Phoenix · Americas · PHX8

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

PNW1

Quincy · Americas · PNW1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

SAT1

San Antonio · Americas · SAT1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

SAT2

San Antonio · Americas · SAT2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

SAT3

San Antonio · Americas · SAT3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

SAT4

San Antonio · Americas · SAT4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

SAT5

San Antonio · Americas · SAT5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
CyrusOneoperational

SAT6

San Antonio · Americas · SAT6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ATL13

Atlanta · Americas · ATL13

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ATL14

Atlanta · Americas · ATL14

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

AUS11

Austin · Americas · AUS11

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

BOG1

Bogota · Americas · BOG1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

BOG2

Bogota · Americas · BOG2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

BOS14

Boston · Americas · BOS14

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

CLT10

Charlotte · Americas · CLT10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

CH1

Chicago · Americas · CH1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

CH2

Chicago · Americas · CH2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

CH3

Chicago · Americas · CH3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ORD011

Chicago · Americas · ORD011

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ORD10

Chicago · Americas · ORD10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ORD12

Chicago · Americas · ORD12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ORD13

Chicago · Americas · ORD13

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ORD14

Chicago · Americas · ORD14

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ORD23

Chicago · Americas · ORD23

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW10

Dallas · Americas · DFW10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW11

Dallas · Americas · DFW11

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW12

Dallas · Americas · DFW12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW16

Dallas · Americas · DFW16

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW17

Dallas · Americas · DFW17

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW18

Dallas · Americas · DFW18

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW25

Dallas · Americas · DFW25

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW26

Dallas · Americas · DFW26

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW28

Dallas · Americas · DFW28

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW29

Dallas · Americas · DFW29

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW35

Dallas · Americas · DFW35

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

DFW36

Dallas · Americas · DFW36

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

FTZ01

Fortaleza · Americas · FTZ01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAH10

Houston · Americas · IAH10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

BUR10

Los Angeles · Americas · BUR10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

LAX10

Los Angeles · Americas · LAX10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

LAX11

Los Angeles · Americas · LAX11

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

LAX12

Los Angeles · Americas · LAX12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

MIA10

Miami · Americas · MIA10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

EWR11

New York · Americas · EWR11

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

EWR12

New York · Americas · EWR12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

EWR20

New York · Americas · EWR20

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

EWR21

New York · Americas · EWR21

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

JFK10

New York · Americas · JFK10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

JFK12

New York · Americas · JFK12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

JFK13

New York · Americas · JFK13

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ACC4

Northern Virginia · Americas · ACC4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ACC5

Northern Virginia · Americas · ACC5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ACC6

Northern Virginia · Americas · ACC6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

ACC7

Northern Virginia · Americas · ACC7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD12

Northern Virginia · Americas · IAD12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD14

Northern Virginia · Americas · IAD14

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD24

Northern Virginia · Americas · IAD24

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD35

Northern Virginia · Americas · IAD35

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD36

Northern Virginia · Americas · IAD36

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD37

Northern Virginia · Americas · IAD37

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD38

Northern Virginia · Americas · IAD38

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD39

Northern Virginia · Americas · IAD39

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD40

Northern Virginia · Americas · IAD40

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

IAD44

Northern Virginia · Americas · IAD44

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

VA3

Northern Virginia · Americas · VA3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

PHX10

Phoenix · Americas · PHX10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

PHX15

Phoenix · Americas · PHX15

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

PDX10

Portland · Americas · PDX10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

PDX12

Portland · Americas · PDX12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

MEX01

Querétaro · Americas · MEX01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

MEX02

Querétaro · Americas · MEX02

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

MEX03

Querétaro · Americas · MEX03

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

RIO01

Rio de Janeiro · Americas · RIO01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

RIO02

Rio de Janeiro · Americas · RIO02

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

CHL01

Santiago · Americas · CHL01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

CHL02

Santiago · Americas · CHL02

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

CHL03

Santiago · Americas · CHL03

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SEA10

Seattle · Americas · SEA10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

OAK10

Silicon Valley · Americas · OAK10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SC1

Silicon Valley · Americas · SC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SFO10

Silicon Valley · Americas · SFO10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SFO12

Silicon Valley · Americas · SFO12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC10

Silicon Valley · Americas · SJC10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC11

Silicon Valley · Americas · SJC11

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC14

Silicon Valley · Americas · SJC14

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC15

Silicon Valley · Americas · SJC15

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC16

Silicon Valley · Americas · SJC16

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC29

Silicon Valley · Americas · SJC29

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC30

Silicon Valley · Americas · SJC30

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC31

Silicon Valley · Americas · SJC31

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC34

Silicon Valley · Americas · SJC34

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC35

Silicon Valley · Americas · SJC35

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SJC37

Silicon Valley · Americas · SJC37

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

CPS01

São Paulo · Americas · CPS01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

HTL01

São Paulo · Americas · HTL01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

HTL02

São Paulo · Americas · HTL02

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

HTL03

São Paulo · Americas · HTL03

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

HTL04

São Paulo · Americas · HTL04

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

HTL05

São Paulo · Americas · HTL05

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

HTL06

São Paulo · Americas · HTL06

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

JDI01

São Paulo · Americas · JDI01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

JDI02

São Paulo · Americas · JDI02

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

PLN01

São Paulo · Americas · PLN01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SP01

São Paulo · Americas · SP01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SP02

São Paulo · Americas · SP02

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SP03

São Paulo · Americas · SP03

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SP04

São Paulo · Americas · SP04

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SP05

São Paulo · Americas · SP05

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SP06

São Paulo · Americas · SP06

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SUM01

São Paulo · Americas · SUM01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SUM02

São Paulo · Americas · SUM02

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SUM03

São Paulo · Americas · SUM03

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SUM04

São Paulo · Americas · SUM04

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

SUM05

São Paulo · Americas · SUM05

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

VIN01

São Paulo · Americas · VIN01

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

VIN02

São Paulo · Americas · VIN02

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

TOR1

Toronto · Americas · TOR1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

YYZ10

Toronto · Americas · YYZ10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Digital Realtyoperational

YYZ12

Toronto · Americas · YYZ12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

AT1

Atlanta · Americas · AT1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

AT4

Atlanta · Americas · AT4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

BO1

Boston · Americas · BO1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

BO2

Boston · Americas · BO2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CH1

Chicago · Americas · CH1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CH2

Chicago · Americas · CH2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CH3

Chicago · Americas · CH3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CH4

Chicago · Americas · CH4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CH7

Chicago · Americas · CH7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CU1

Culpeper · Americas · CU1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CU2

Culpeper · Americas · CU2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CU3

Culpeper · Americas · CU3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CU4

Culpeper · Americas · CU4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

CU6

Culpeper · Americas · CU6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DA1

Dallas · Americas · DA1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DA10

Dallas · Americas · DA10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DA11

Dallas · Americas · DA11

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DA2

Dallas · Americas · DA2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DA3

Dallas · Americas · DA3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DA4

Dallas · Americas · DA4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DA6

Dallas · Americas · DA6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DA7

Dallas · Americas · DA7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DA9

Dallas · Americas · DA9

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DE1

Denver · Americas · DE1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DE2

Denver · Americas · DE2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

HO1

Houston · Americas · HO1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

LA1

Los Angeles · Americas · LA1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

LA3

Los Angeles · Americas · LA3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

LA4

Los Angeles · Americas · LA4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

LA6

Los Angeles · Americas · LA6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

LA7

Los Angeles · Americas · LA7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

MI1

Miami · Americas · MI1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

MI2

Miami · Americas · MI2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

MI3

Miami · Americas · MI3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

MI6

Miami · Americas · MI6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

NY1

New York · Americas · NY1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

NY11

New York · Americas · NY11

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

NY13

New York · Americas · NY13

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

NY2

New York · Americas · NY2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

NY4

New York · Americas · NY4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

NY5

New York · Americas · NY5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

NY6

New York · Americas · NY6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

NY7

New York · Americas · NY7

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

NY9

New York · Americas · NY9

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

PH1

Philadelphia · Americas · PH1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

RJ1

Rio de Janeiro · Americas · RJ1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

RJ2

Rio de Janeiro · Americas · RJ2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SE2

Seattle · Americas · SE2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SE3

Seattle · Americas · SE3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SE4

Seattle · Americas · SE4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV1

Silicon Valley · Americas · SV1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV10

Silicon Valley · Americas · SV10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV11

Silicon Valley · Americas · SV11

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV14

Silicon Valley · Americas · SV14

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV15

Silicon Valley · Americas · SV15

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV16

Silicon Valley · Americas · SV16

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV2

Silicon Valley · Americas · SV2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV3

Silicon Valley · Americas · SV3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV4

Silicon Valley · Americas · SV4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV5

Silicon Valley · Americas · SV5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV8

Silicon Valley · Americas · SV8

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SV9

Silicon Valley · Americas · SV9

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SP1

São Paulo · Americas · SP1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SP2

São Paulo · Americas · SP2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

SP3

São Paulo · Americas · SP3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC1

Washington, D.C. · Americas · DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC10

Washington, D.C. · Americas · DC10

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC11

Washington, D.C. · Americas · DC11

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC12

Washington, D.C. · Americas · DC12

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC13

Washington, D.C. · Americas · DC13

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC14

Washington, D.C. · Americas · DC14

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC15

Washington, D.C. · Americas · DC15

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC2

Washington, D.C. · Americas · DC2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC21

Washington, D.C. · Americas · DC21

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC3

Washington, D.C. · Americas · DC3

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC4

Washington, D.C. · Americas · DC4

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC5

Washington, D.C. · Americas · DC5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC6

Washington, D.C. · Americas · DC6

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC8

Washington, D.C. · Americas · DC8

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Equinixoperational

DC97

Washington, D.C. · Americas · DC97

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

AMS-1

Amsterdam · EMEA · AMS-1

Total critical power14.1 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

BOS-1

Boston · Americas · BOS-1

Total critical power3.6 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

NCR-1

Delhi-NCR · APAC · NCR-1

Total critical power5 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

DEN-1

Denver · Americas · DEN-1

Total critical power14.4 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

FRA-1

Frankfurt · EMEA · FRA-1

Total critical power27 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

FRA-2

Frankfurt · EMEA · FRA-2

Total critical power10.6 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

KCM-1

Kansas City · Americas · KCM-1

Total critical power3.9 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

LON-1

London · EMEA · LON-1

Total critical power10 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

MUM-1

Mumbai · APAC · MUM-1

Total critical power2 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

NJE-1

New Jersey · Americas · NJE-1

Total critical power26.1 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

VA-1

Northern Virginia · Americas · VA-1

Total critical power12.4 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

VA-2

Northern Virginia · Americas · VA-2

Total critical power24 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

OHS-1

Ohio · Americas · OHS-1

Total critical power1.4 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

AZP-1

Phoenix · Americas · AZP-1

Total critical power41 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

AZP-2

Phoenix · Americas · AZP-2

Total critical power48 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

PUN-1

Pune · APAC · PUN-1

Total critical power10 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

AZS-1

Scottsdale · Americas · AZS-1

Total critical power5.7 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

SIN-1

Singapore · APAC · SIN-1

Total critical power6 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
Iron Mountainoperational

WPA-1

Western Pennsylvania · Americas · WPA-1

Total critical power15.5 MW
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

ATL1 DC1

Atlanta · Americas · ATL1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

ATL1 DC2

Atlanta · Americas · ATL1-DC2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

SUW1 DC1

Atlanta · Americas · SUW1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

SUW1 DC2

Atlanta · Americas · SUW1-DC2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

CHI1 DC1

Chicago · Americas · CHI1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

DFW1 DC1

Dallas–Fort Worth · Americas · DFW1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

DFW1 DC2

Dallas–Fort Worth · Americas · DFW1-DC2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

FTW1 DC1

Dallas–Fort Worth · Americas · FTW1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

DEN1 DC1

Denver · Americas · DEN1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

EEM1 DC1

Eemshaven · EMEA · EEM1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

GRO1 DC1

Groningen · EMEA · GRO1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

OVP1 DC1

Kansas City · Americas · OVP1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

MIA1 DC1

Miami · Americas · MIA1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

PJC1 DC1

New Jersey · Americas · PJC1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

PNJ1 DC1

New Jersey · Americas · PNJ1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

JCY1 DC1

New York · Americas · JCY1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

ASH1 DC1

Northern Virginia · Americas · ASH1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

ASH3 DC1

Northern Virginia · Americas · ASH3-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

ASH3 DC2

Northern Virginia · Americas · ASH3-DC2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

IAD2 DC1

Northern Virginia · Americas · IAD2-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

MAN1 DC5

Northern Virginia · Americas · MAN1-DC5

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

HIL1 DC1

Portland · Americas · HIL1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

RIC1 DC1

Richmond · Americas · RIC1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

RIC1 DC2

Richmond · Americas · RIC1-DC2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

SAC1 DC1

Sacramento · Americas · SAC1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

SAT2 DC1

San Antonio · Americas · SAT2-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

SJC1 DC1

Silicon Valley · Americas · SJC1-DC1

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation
QTSoperational

SJC1 DC2

Silicon Valley · Americas · SJC1-DC2

Total critical powerNot disclosed
CoolingNot disclosed
Physical efficiencyNeeds confirmationGrid conditionsNeeds confirmationEnergy procurementNeeds confirmation